RMQ Schedule

Phase 1 - Construction
1. Erect a perimeter fence (6,500 lineal feet)
2. Install erosion controls (SWPPP under RWQCB)
3. Relocate the quarry entrance
4. Excavate and process the materials for SR-76 (175,000 cy)
5. Construct a 30 foot site-berm at entrance
6. Prepare the site for aggregate and asphalt plant construction (1.4 million cy)
|  |
|
 |